Showing posts with label shooting schedule. Show all posts
Showing posts with label shooting schedule. Show all posts

Friday, 11 January 2013

Shooting schedule: January

The final month of filming! With only a few shots to go January is our last scheduled filming date.


Shooting Schedule no 5:

Crew needed: Summer, Farah
Date: 4th January
Actors needed: Drake (Dani), Della (Farah Speer)
Actor arrival time: 11am am meet at Summer's house
Arrive at Destination: 11 am
Time allocated for makeup: An hour/
Begin shooting: 12 pm
Estimated shooting time needed: Two/three hours
Props needed: Makeup (fake blood and body paint for bruising, wounds etc.) costume and weapons fake rifle.
Lighting: LED lights
Sound equipment: (all)
Camera equipment: two tripods, Cannon 550D, Nikon DSLR (for photos)

Friday, 30 November 2012

Shooting schedule: December

Because of the difficulties with getting actors and crew together on the same day, and also the issues with getting days with similar weather for continuity within shots, we had to do several shoots, below is the schedule for December.

Shooting Schedule no 4:

Crew needed: Summer
Date: 12th December
Actors needed: Drake (Dani)
Actor arrival time: 11am am meet at Summers house
Arrive at Destination: 11 am
Time allocated for makeup: An hour/
Begin shooting: 12 pm
Estimated shooting time needed: Two/three hours
Props needed: Makeup (fake blood and body paint for bruising, wounds etc.) costume and weapons fake rifle.
Lighting: LED lights
Sound equipment: (all)
Camera equipment: two tripods, Cannon 550D, Nikon DSLR (for photos)

Wednesday, 7 November 2012

Shooting Schedule: November

To make sure filming is efficient and everyone has a general idea of what's happening I  have created a series of  shooting schedules, listing what is needed and timings for each day. This is the shooting schedule, for the day(s) of filming.

Shooting schedule no 1:


Crew needed: Farah, Dani, Summer
Date: 17/18th November
Characters (Actors) needed: Jesse (Curtis Stuart), Della (Farah Speer)
Actor Arrival time: 10:30/11 am
Crew Arrival time: 10/10:30 am
Time allocated for makeup: 30 minutes
Begin shooting: 12 pm
Shooting time (estimation): 2/3 hours
Props needed: Blade, Bow and Arrow
Lighting: Natural light
Camera equipment: Tripod, Cannon 550D, Nikon DSLR
Sound equipment: Mic, Headphones


Shooting Schedule no 2:

Crew needed: Farah, Dani, Beth, Summer
Date: 1st November
Actors needed: Della (Farah Speer)
Actor arrival time: 11am am meet at Summers house
Arrive at Destination: 11 am
Time allocated for makeup: An hour/2 hours (Beth in charge of makeup)
Begin shooting: 12 pm
Estimated shooting time needed: Two/three hours
Props needed: Makeup (fake blood and body paint for bruising, wounds etc.) costume and weapons (all).
Lighting: LED lights
Sound equipment: (all)
Camera equipment: two tripods, Cannon 550D, Nikon DSLR (for photos)

Shooting Schedule no 3:

Crew needed: Farah, Dani, Beth, Summer
Date: 1st December
Actors needed: Eris (Cleopatra Wood), Nyla (Debbie Voshart), Jesse (Curtis Stewart), Della (Shahira Clea), Malory (Sheng chui)
Actor arrival time: 10:30 am meet at Woolwhich station
Arrive at Destination: 10:45
Time allocated for makeup: An hour/2 hours (Beth)
Begin shooting: Dependent on arrival time
Estimated shooting time needed: Three/Four hours
Props needed: Makeup, body paint, eyeliner for wounds and scratches (fake blood etc.) costume and weapons (all).
Lighting: n/a
Sound equipment: (all)
Camera equipment: two tripods, Cannon 550D, Nikon DSLR (for photos)